WORKING DRAFT · REV 06 Content, pricing, & initiative names for review
PACE Execution
PACE Penetration / Borehole completion

Two completions.
Different outcomes.

Explore proper and adverse drilling and completion using the finished PACE borehole diagrams. Switch views to compare the source from the surface downward.

Proper completion: centered casing, planned screens, annular isolation, and a sealed wellhead.

Proper borehole completion showing centralizers, sanitary and intermediate bentonite seals, target aquifers, screens and a shale trap.

Conceptual comparison with exaggerated width and abbreviated depth intervals. The adverse example illustrates failure mechanisms, rather than describing every borehole in any region.

Read the borehole completion white paper ↗
Completion observations

Compare the details.

ElementProper exampleAdverse example
WellheadTop plate well seal, protected cable route, and surface apron.Loose plate, open penetrations, and exposed cable.
Casing & trajectoryCasing extends through the target intervals, with centralizers and a casing shoe.Wandering borehole and eccentric casing; the casing hangs up on a ledge or dogleg.
Screen placementSelected screens correspond to the target aquifers.Alternating screened and plain casing admits water from unwanted zones; deeper targets remain unreached.
Annular materialsSurface sanitary seal, intermediate seals, and selected filter pack isolate intervals.Shallow seal and bridged gravel leave unfilled annular space below.
Water qualityCompletion aims to isolate unwanted contributing zones.Shallow turbidity, iron-oxidizing bacteria, and pathogens, plus iron, hardness, and salinity from other zones, illustrate potential mixing.
Downhole conditionPump, dry-run sensor, and water level are shown in the completed source.Drawdown, cascading inflow, and iron oxide floc fill illustrate an adverse operating condition.
From drilling to verification

Know which zones contribute.

Log drilling progress, water strikes, driller’s yield, conductivity, and water-quality samples by depth. Use those records, borehole geometry, and formation conditions to plan casing, screens, filter pack, and seals. Verify the completed source with development, pumping tests, and water-quality testing.

Explore all PACE focus areas ↗

Borehole completion white paper

Read the completion and artesian containment paper ↗